Bridge Replacements

This website will share project details and how to provide comments throughout the design and construction process.

Image by LaDawn Preuninger

About

The Village of Ruidoso has begun a project to provide comprehensive analysis, design, and replacement for six bridges located within residential neighborhoods in the Village. This project stems from the original damage that occurred in 2008, while responding to the urgent infrastructure needs of today, wrought by the significant additional damages resulting from recent wildfire and subsequent flooding events.  Several of these bridges serve as the sole access routes to their respective communities, making their restoration critical to public safety, emergency response, and the long-term resilience of local transportation networks. The project locations are:

  • McDaniel Dr

  • North Loop

  • Main Rd 2

  • Sleepy Hollow Rd

  • River Trail

  • Robin Rd

 

This project will include site investigations, hydrologic and hydraulic analyses, environmental compliance, structural design, permitting, and construction of six bridges. The design will prioritize improved resilience to future wildfire and flood events, compliance with current engineering standards, and minimization of community disruption during construction.

This critical infrastructure improvement project will enhance safety, restore essential connectivity, and support the long-term recovery and hazard mitigation goals of the Village of Ruidoso.

McDaniel Rd Bridge.png

McDaniel Dr

Details coming soon.

N Loop Rd Bridge 2 with Circle.png

North Loop

Details coming soon.

Main Rd Bridge.png

Main Road 2

Details coming soon.

Sleepy Hollow Rd Bridge.png

Sleepy Hollow Rd

Details coming soon.

River Trail Bridge.png

River Trail

Details coming soon.

Robin Rd Bridge.png

Robin Road

Details coming soon.

Image by LaDawn Preuninger

Review the Designs

The 30% designs for all 6 bridges are anticipated to be ready during the Summer of 2026 and will be posted here for your review.

Community Engagement Opportunities

Return to the project website to find out about public meetings, questionnaires, and to leave a comment on the interactive map!

Public Meetings

Join one or both of the first set of public meetings to learn about the Ruidoso bridge replacements and share your questions and concerns. All are welcome at either and/or both meetings.

​​

Tuesday, June 16, 2026

5:30-7pm

Flyer #1 [05-21-26]_Page_1.png

Ruidoso Convention Center, 111 Sierra Blanca Dr

This meeting will provide an overview of the project and allow for members of the community to interact with the project team and village staff, and will focus the McDaniel Dr, North Loop, and Main Rd 2 locations.

Wednesday, June 17, 2026

5:30-7pm

Flyer #1 [05-21-26]_Page_1.png

Ruidoso Convention Center, 111 Sierra Blanca Dr

This meeting will provide an overview of the project and allow for members of the community to interact with the project team and village staff, and will focus on the Sleepy Hollow Rd, River Trail, and Robin Rd locations.

Flyer #1 [05-21-26]_Page_1.png

Public Meeting Flyer

Click the button below to download a flyer which details the upcoming public meetings for this project.

Share Your Thoughts

Is there anything that you would like share with the project team as we begin design of the new bridges?

Image by Paul Marlow

Use the Interactive Map

Screenshot 2026-05-21 134053.png

Please visit the interactive map to zoom in on the project locations and share questions, comments, and concerns regarding each specific river crossing.

Image by Adrián Valverde

Anticipated Timeline

Design and construction of the bridges will be phased.

Spring
2026

Project Kick Off

Summer - Fall
2026

Public Meeting, Drainage Analysis, 30% Design

Fall - Winter
2026

Begin Environmental Assessment, Public Meeting, 60% Design

Winter 2026 - Spring 2027

Public Meeting, 90% Design

2026

2027

Spring - Summer
2027

100% Design

Summer - Fall
2027

Bid Opening

Fall 2027 - Summer 2028

Construction

Contact Us

If you have quesitons or concerns, please get in touch with the project team using the phone number or email below!

505-264-0111 

RuidosoBridges@bhinc.com